What do the terms mean?
The glossary has 17 terms grouped under construction, law, finance, architecture and the area. Each term has a simple, single-paragraph definition and its source.
17 terms
Bafra Tourism AreaArea
A tourism area north of İskele with a concentration of five-star hotels; it is 6 minutes from VivaMore.
Details and sourceC35 concreteConstruction
A concrete grade with a characteristic cylinder compressive strength of 35 MPa at 28 days, commonly used in residential structural systems. This is the grade used for VivaMore's foundation and structure.
Details and sourceConstruction easementLaw and title deeds
A right established over each independent unit in a building under construction, together with its land share; it is converted into condominium ownership when the building is completed. VivaMore's construction easement title deeds are due to be issued shortly.
Details and sourceCondominium ownershipLaw and title deeds
Separate ownership rights established over individual units in a building, including a share in communal areas. Title transfer and complex management operate on this basis.
Details and sourceHandover paymentFinance
The final instalment paid when the keys are handed over. Its amount and terms are set out in the payment plan and considered alongside the pre-handover checklist.
Details and sourceDown paymentFinance
The initial portion of the sales price paid on signing the contract. Its percentage and payment terms are defined in the contract; the amount for VivaMore is available from the Sales Office.
Details and sourceGross / net m²Construction
Net m² is the usable internal floor area of an apartment; gross m² adds walls, balconies/terraces and a share of communal areas. At VivaMore, each layout's gross area is shown on its own page.
Details and sourceInsulationConstruction
Building layers that limit heat, water and sound transmission. Thermal insulation affects energy costs, waterproofing affects the building's service life, and sound insulation affects everyday comfort.
Details and sourceRaft foundationConstruction
A reinforced concrete slab foundation covering the building's entire footprint, spreading loads over a wide area to reduce differential settlement. Used at VivaMore in accordance with the ground investigation.
Details and sourceRental guarantee schemeFinance
A model in which property management guarantees rental income subject to specified conditions. At VivaMore it is offered through Point App & Concierge; terms are available from the Sales Office.
Details and sourceRental yieldFinance
The ratio of a property's annual net rental income to its purchase price. VivaMore rental income is denominated in foreign currency.
Details and sourceRoyal TerraceArchitecture
VivaMore's apartment category on the 7th floor and above, offering studio, one-bedroom and two-bedroom layouts with spacious private terraces and private plunge pools.
Details and sourceSeismic codeConstruction
Technical regulations defining the seismic loads used to calculate a building's structural system. Design calculations and inspections follow this code.
Details and sourceStructural works / finishing worksConstruction
Structural works cover load-bearing elements such as foundations, columns, beams and slabs; finishing works include plastering, screeds, finishes, windows and doors, and installation finishing. SPOINT's background is in finishing and fit-out works.
Details and sourceSignature / Signature+ apartmentArchitecture
A VivaMore apartment option decorated by Leopoint Furniture and delivered fully furnished and ready to live in, with all furniture and living details in place.
Details and sourceSite planArchitecture
A scaled drawing showing the arrangement of blocks, communal areas, parking and landscaping on the site. Used when choosing an apartment to establish orientation and views.
Details and sourceGround investigationConstruction
Borehole drilling, laboratory testing and reporting to establish the site's ground classification and bearing capacity; the foundation type is selected based on this report.
Details and source
The company developing VivaMore
SPOINT Construction
Group companies: Leopoint Furniture · Gold Stone
- 29Completed projects
- 260,000 m²Total project area
- 6Countries











