Quick answer
VivaMore: raft foundation and C35 per ground survey. Assess structure, seismic code and independent inspections; ask Sales Office for code and inspector.
What does the seismic code do?
The code defines the seismic loads used to calculate the building's structural system. Design calculations are prepared and checked in accordance with this code.
How does inspection work?
An independent inspection or supervision firm checks reinforcement, concrete pouring and construction stages and keeps records. The Sales Office can provide details of the inspection body working on VivaMore.
What should buyers check?
The geotechnical report, foundation type, concrete grade, inspection records and sample test results; making these documents available on request is a sign of transparency.
Questions and answers
How is concrete strength verified?
Samples are taken from each concrete pour and tested for compressive strength in a laboratory at 7/28 days; results are held in the project team's files and shared on request.
Which documents can I request?
The geotechnical report, foundation type approval and concrete grade certificate can be requested from the sales support team.
Sources
- SPOINT Construction project documentation — SPOINT Construction,
Related articles
- Construction Quality
Raft foundation, C35 concrete and ground investigation: VivaMore's structural system
VivaMore uses a raft foundation and C35 concrete in accordance with the geotechnical report; ground was broken on 12 June 2026. Documents can be requested from the sales support team. These three elements determine how the building's load is distributed across the ground and the strength of its concrete.
Read more - Construction Quality
Thermal insulation, waterproofing and sound insulation: the unseen layers of comfort
Thermal insulation affects energy costs, waterproofing affects a building's service life, and sound insulation affects everyday comfort. Contact the Sales Office for details of the insulation materials and thicknesses used at VivaMore.
Read more - Construction Quality
Pre-handover checklist: what to check when taking possession of an apartment
At handover, wet areas, windows and doors, electrical and mechanical installations, floors and surface finishes, and communal areas are checked; outstanding items are recorded in the handover record.
Read more












